Can AI Spot Project Problems Before the Project Manager Does?

Rich Plumery explains where AI adds the most value on a large project, and why the goal is earlier intervention, not better hindsight.

Can AI spot a struggling project before the project manager does? According to Rich Plumery, yes, and it is one of AI’s highest-value uses.

Sitting on top of an ERP, AI works with live data and actuals instead of a monthly download. That lets teams focus on the critical 20% of activities that drive the outcome and act while there is still time.

The question

The moderator asked Rich whether AI can identify deteriorating project performance before a project manager even recognizes it.

What Rich said

  • Earlier detection is among AI’s highest-value uses. It can flag declining performance before a project manager spots it.
  • It starts with live data. AI that sits on top of an ERP can gather and process real-time data, including actuals.
  • Delay is the real problem. Many projects download data monthly or face reporting delays, so teams see the warning signs only when the issue is no longer actionable.
  • Focus on the critical 20%. AI helps teams concentrate on the activities that truly drive the outcome.
  • Clarity builds teamwork. When the critical activities are clear, everyone understands what is happening and where to act right away.

Three tests for any early-warning claim

A monthly cycle means the number a project manager reviews describes a project that has already moved. Hindsight arrives on schedule. Early warning does not. When a vendor says its AI can see trouble coming, test it:

  1. How old is the data the AI reads? Live from the system of record, or a monthly export?
  2. Does it show which activities matter, and why? An alert with no explanation is noise. The critical 20% needs a reason attached.
  3. What happens after the alert? Someone has to own it, and the next step should be a supervised action, not a meeting request.

INSIDE PACE

PACE keeps the numbers underneath any warning current, so the alert points at something real.

• Inception-to-Date actuals are a live feed of processed transactions, shown next to the last synced Actual Cost, so teams know which number they are looking at.

• Refresh Actuals pulls timecards, timesheets and approved vendor invoices and recalculates ETC = Proposed Cost − Actual Cost. The system enforces a refresh every two to three weeks.

• On project approval, the project structure and baseline budget integrate with the connected ERP, so planning and finance start from the same numbers.

• PACE AI monitors 300+ live signals across cost, schedule, margin, AR, risk and delivery progress, and AI Briefs explain what changed and where attention is required.

Who is in the conversation

  • Rich Plumery, retired Senior Vice President, AECOM
  • Matt Rotherham, Executive Sales Director, Frontrol (moderator
  • Ben Heys, VP, Business Development & Services, Frontrol

Frequently asked questions

Can AI detect project problems before a project manager does?

Yes, according to the panel, and it is one of AI’s highest-value uses. AI that sits on top of an ERP can work with real-time data and actuals, so it can flag declining performance before it shows up in a monthly report.

Why do project teams see warning signs too late?

Many projects download data monthly or face reporting delays. By the time the numbers reach the team, the issue is no longer actionable. The panel’s point is that the goal is earlier intervention, not better hindsight.

What is the critical 20% of project activities?

It is the panel’s rule of thumb that roughly 20% of activities drive most of a project’s outcome. AI helps teams find and focus on them, so everyone understands what is happening and where to act right away.



Frequently asked questions

Will AI replace project controls professionals?

No. The panel’s view is that AI should help people step in early, before a problem turns into a bad outcome. It takes on summarizing and gathering information so professionals can spend their time on analysis and decisions.

What should AI do in capital project delivery?

It should summarize information, bring the key data forward so everyone on the team can use it, and remove efficiency barriers. That frees professionals to focus on analytical work and on better business outcomes.

How do you keep AI from adding complexity to project delivery?

Choose AI that works inside the platform your team already uses, on live data and within each person’s existing permissions. If it needs its own system, its own data preparation and its own review cycle, it adds to the pile instead of simplifying it.

See PACE AI on your kind of project

In 20 minutes, we’ll show how PACE AI surfaces deviation early, summarizes project risk in plain language and reduces reporting effort. No slides.

Request an AI walkthrough · Explore PACE AI

  • Watch the full webinar → /events/ai-in-project-controls-webinar/
  • Read the guide: AI in Project Controls: The Four Types of AI and the Decisions That Still Need a Human → /blog/ai-in-project-controls/

See other trending blogs

Let's Talk — We're Here to Help

We’re happy to answer your questions and help you determine how Frontrol can bring clarity, control, and confidence to your project execution. Whether you’re exploring automation, need better visibility, or want to streamline contractor coordination, we’ve got you covered.

Why Frontrol?
What happens next?
1

We Connect

2

We Explore Together

3

We present a proposal

Schedule a demo